47°01′N 24°20′E / 47.017°N 24.333°E / 47.017; 24.333StatusOperationalCommission date2012Construction cost€6.2 millionOwner(s)DayLight Energy GroupSolar farm TypeFlat-panel PVPower generationNameplate capacity1.7 MW
[edit on Wikidata]

Lechința Solar Park, a large thin-film photovoltaic (PV) power system, lies on a 3.4 ha (8.4 acres) plot of land near the Lechința commune in Romania.[1][2] The power plant is a 1.7-megawatt solar power system using state-of-the-art thin film technology, and was completed in August 2012, one month after construction started. The solar park features 6,762 solar panels and 54 string inverters.[3] It supplies 1,000 MWh of electricity per year.[1][2]

The installation is located in Bistrița-Năsăud County, in central-northern Romania. The investment cost for the Lechința solar park amounted to some €6.2 million.[1][2]

See also

  • flagRomania portal
  • iconRenewable energy portal

References

  1. ^ a b c "Cel mai mare parc solar din SE Europei se construiește într-un sat din Bistrița-Năsăud" (in Romanian). Adevărul. 2011-04-14. Retrieved 2011-12-27.
  2. ^ a b c "20 Biggest Solar Projects in Romania". www.solarfeeds.com. November 22, 2021. Retrieved July 29, 2022.
  3. ^ "Lechința 1 PV Project (1.7 MW)". www.egnatia-rom.ro. Retrieved July 29, 2022.
  • v
  • t
  • e
Operational
Under construction
  • Arad 1 - 1044MW
  • Mândra - 38MW
Proposed
  • Covaci - 35MW
  • Fierbinți - 10MW
  • Satu Mare - 8MW
  • Ciorani - 5MW
  • Târgu Jiu - 4MW
  • Avram Iancu - 3MW
  • Borș - 3MW
  • Gura Ialomiței - 2MW